SUBSTATION CONSTRUCTION
Construction of substations
STRINGING OF HV EQUIPMENT
- Stringing of HV Equipment from 11kV to 765kV
- Refurbishment Projects
- Installation of Tubular Bus bars
EARTHING OF HV EQUIPMENT
- Installation of Earth Strap on New Equipment
- Repairs to Damaged or Stolen Earth Strap
- Earth Mat Continuity Testing
CABLING
- Installation of Control Cables from Panel to JB, JB to equipment , termination and
testing
- Installation and Termination of Telecoms Cables from Control Panels to
e.g. IDF,ERTU
- Terminations and Jointing of XLPE and Paper Insulated Cables from 6.6kV – 22KV
- Pressure Testing and Tan Delta Testing of MV Cables
FIBRE OPTIC CABLES
- Supply, Installation and Fusion Splice of Multi-Mode and Single Mode fibre cables
in the Sub Station Yard
- Testing of MM and SM fibres
- Supply and Installation of Wire Mesh Cable Trunking
DISMANTLING & ERECTION OF HV EQUIPMENT
- Refurbishment projects
- Upgrading of underrated equipment
- Installation and removal of control panels
- Supply and Erection of HV Yard Steelwork
MINOR CIVIL WORKS
- Casting of JB, medium Equipment and Isolator Foundations
- Installation of Chemical Anchors
LINE MAINTENANCE
- Maintenance of Lines up to 132kV ( Insulator Repairs, Installation of Anti Climb
devices, repairs to damaged lines)
- Construction of Line deviations
- Supply and Installation of Bird Diverters (Recent: Lewensaar – Ferrum s/s275kV
Line)
- Construction of By-Passes 88kV to 400kV (Recent: Bernina 132kv By Pass, Hydra
400kV By pass, Lethabo & Glockner s/s, 400kV By Passes)
PLANT AND EQUIPMENT
- Three Crane Trucks mounted With HIAB 244’s and a Pesci 170.
- Cranes have Hydraulic Reach between 18 meter and 28 meters
- Site Offices and Container Store Rooms
- Izumi Hydraulic Press Machines
- Quantum’s and Condor for Staff Transport